  • The program will improve 802 of MoDOT’s most worn-out bridges in five years – by Dec. 31, 2013.

  • The 802 bridges are divided into two groups. 248 have been identified for rehabilitation. 554 will be completely replaced.

  • On May 21, 2009, the Missouri Highways and Transportation Commission selected KTU Constructors to replace 554
    bridges in a single design-build contract.

  • KTU Constructors is utilizing a number of Missouri-based subcontractors and materials suppliers to deliver the project.

  • There are 10,249 bridges on the Missouri state highway system – 7th largest total nationwide.

  • Approximately 1,100 of them are in poor/serious condition. The Safe & Sound Initiative will address most of these bridges.